The Green Line’s real cost history.
One project — and five different numbers in circulation.
The Green Line has been called a $4.6B, $5.5B, $6.2B, $7.5B and $7.2B project — not because the cost is a mystery, but because those numbers measure different things at different moments. This piece lays out the primary-verified spine, shows that the entire 2020→2024 increase is the City’s own $705M top-up, and inventories exactly what the public is not allowed to see.
Primary-verified, with citationscost + funding spinethe redaction inventory
verification
primary-verified
derivation
Piece-identity + hero-stat artefact for /transit/green-line. The FeatureStat (current approved $6.248B Phase 1 total) and the three supporting BentoStats are the same primary-verified figures carried by the sibling cost-timeline.json (funding_split + timeline); they are surfaced here as the piece masthead. Every hero figure's source_url resolves to a meta.sources entry.
sources